Thunderbirds Under Gate Cable kits are used to feed electric fence power to the next section of fence, underneath a gateway.
Supplied with earth and live double insulated wires, wire joint clamps and flexible conduit to protect cable from damaging objects like rocks and other failures causing voltage loss.
Installing Your Under Gate Cable Kit
- Ensure you have turned your energiser off
- Dig a small trench between the two gate posts approx. 300mm deep
- Lay conduit and cable into trench
- Bend ends of conduit over to prevent rainwater entry and fasten into position by wiring around post
- Connect both Earth and Live fence wires each side with Wire Joint Clamps and tighten with a shifter
- Backfill and pack soil into trench
- Turn your energiser back on and test



Reviews
There are no reviews yet.